Utility Piperack structure, Fabrication & Erection with Priming & Painting including Piping with Insulation.
Utility Piperack structure, Fabrication & Erection with Priming & Painting including Piping with Insulation.
Project Type | Utility Piperack & Piping |
Client | Amneal Pharmaceuticals |
Project Duraction | 90 Days |
Project Size | 125000 Kg & 1 Inch to 12 Inch Piping |
Establishment Year | 2015 |
Amneal Pharmaceuticals
Design & Develop by Avanzar Solution.